Group 6 – The Creation: Days 4-7

From Day 4 to Day 7 the group was working tirelessly on making our vision come real. In the initial phase everything went according to the plans.

By the beginning of Day 7 both the wristband and the quilt were in good shape. After connecting them we spent a long time with troubleshooting, but fortunately by the end of the day the product was working.

http://www.objectdna.com/workshops/wp-content/uploads/2011/10/7o.jpg 640w" sizes="(max-width: 300px) 100vw, 300px" />

Cici and Tamás working hard

http://www.objectdna.com/workshops/wp-content/uploads/2011/10/456g2.jpg 640w" sizes="(max-width: 300px) 100vw, 300px" />

http://www.objectdna.com/workshops/wp-content/uploads/2011/10/45c2.jpg 640w" sizes="(max-width: 300px) 100vw, 300px" />

Sachith and Tamás are having fun with Chandra while working on the design

http://www.objectdna.com/workshops/wp-content/uploads/2011/10/7n1.jpg 640w" sizes="(max-width: 300px) 100vw, 300px" />

Sachith sewing the pattern on the quilt

http://www.objectdna.com/workshops/wp-content/uploads/2011/10/7l.jpg 640w" sizes="(max-width: 300px) 100vw, 300px" />

The quilt in production

http://www.objectdna.com/workshops/wp-content/uploads/2011/10/6f1.jpg 640w" sizes="(max-width: 300px) 100vw, 300px" />

The wristband is finished (special thanks to Hannah for her help)

http://www.objectdna.com/workshops/wp-content/uploads/2011/10/6d1.jpg 640w" sizes="(max-width: 300px) 100vw, 300px" />

Tamás making the wristband

Leave a Reply

Your email address will not be published. Required fields are marked *

 

Spam protection by WP Captcha-Free